Preparing the drainage appendix for the construction of a residential neighborhood on Mount Yonah Phase III, Upper Nazareth.

The drainage appendix examined the effect of a zoning change on the environment in terms of drainage and vice versa, whether the environmental factors could pose a risk to construction from the aspect of drainage, such as flooding and the like.

In addition, the plan discussed the issue of surface runoff, runoff regulation and the like.

Project Details
Location
Upper Nazareth
Israel
Field
drainage
Description
Urban development that requires forethought to consider flood risks
Client Name
The Ministry of Construction and Housing
Main Figures
Assessment of risk level from the perspectives of building new neighborhood

    Interested in a quote for such project ?

    Leave your details and we will contact you soon