Design and Construction of an effluent reclamation system including a reservoir and pipeline and pumping system.
The reservoir gets retiary effluent after WWTP, and delivers it for agricultural irrigation.
This reclamation system essentially brings reclaimed water to an area that previously relied on potable water supply only.
The establishment of the project and the provision of reclaimed water enable significant agricultural development.
Work details:
- Planning and constructing a reservoir with a volume of 2.3 million cubic meters Earthworks.
- Design and constructing diverting the existing pipes from the area and planning and constructing a new pipeline.
- Building a pumping plant – a large concrete chamber.
- Building a pumping system for agricultural irrigation.
- Cover the reservoir by HDPE sheeting to prevent permeation.