After many years of limited activity, the sedimentation ponds collecting the wastewater from Kibbutz Dalia became almost completely blocked. Laboratory results showed the expected treatment process was flawed and the effluent quantity failed to meet the regulatory standards.

It became necessary to remove the sludge from the ponds, while preserving the pond walls, piping systems, pond coating etc.

Sludge treatment was also required to meet the regulatory standards.

Work details

  • Pumping the water into an adjacent pond.
  • Removing the sludge to a drying pond using a backhoe loader.
  • Loading the sludge onto trucks and transporting it to a compost site for treating and recycling to serve various diverse uses.
  • A total of 300,000 thousand tons of sludge was removed from the sedimentation pond including drying and pumping the water.
Project Details
Location
Dalia
Israel
Field
wastewater treatment
Description
ponds restoration and sludge treatment before evacuation to comply with the regulatory requirements.
Client Name
Kibbutz Dalia
Main Figures
wastewater treatment

    Interested in a quote for such project ?

    Leave your details and we will contact you soon