Rearrangement of Harod Stream, extending 1700m up-hill on the outskirts of Rova Yizre’el neighborhood, in the city of Afula.

The terrain on both sides of the stream was initially fitted for rare cases of overflow. The project included earthworks, paving of service roads and concrete installations such as low-water crossings and Rip-Rap, in addition to a concrete bearing, measuring 2.20mX2.20m, with a length of 240m.

Project Details
Location
Afula
Israel
Field
drainage
Description
Urban development of Afula city required attention to drainage and regulation
Client Name
Southern Jordan Drainage Authority
Main Figures
stream regulation threw 1,700 m
Budget
5 Million NIS

    Interested in a quote for such project ?

    Leave your details and we will contact you soon